Episode 51 - Two big ADOT projects are improving Loop 101 in the Valley episode artwork

EPISODE · Nov 22, 2024 · 13 MIN

Episode 51 - Two big ADOT projects are improving Loop 101 in the Valley

from On The Road With ADOT · host ADOT

Episode 51 - ADOT's Doug Nintzel sits down with ADOT engineers Joe Heller and Joel Porras to discuss the current projects on the L-101.

Episode metadata supplied by the publisher feed · Published Nov 22, 2024

Embed this episode

NOW PLAYING

Episode 51 - Two big ADOT projects are improving Loop 101 in the Valley

0:00 13:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Road With ADOT?

This episode is 13 minutes long.

When was this On The Road With ADOT episode published?

This episode was published on November 22, 2024.

Can I download this On The Road With ADOT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!