Episode 55: Connecting Toledo Neighborhoods to Opportunity with the Dorr St. to Adams St. Project  episode artwork

EPISODE · Dec 4, 2024 · 11 MIN

Episode 55: Connecting Toledo Neighborhoods to Opportunity with the Dorr St. to Adams St. Project

from Wednesdays with Wade · host City of Toledo

Economic Development Director Brandon Sehlhorst and Toledo Design Collective Studio Director Ryan Bunch join Mayor Wade to discuss an upcoming $53 million investment to improve safety and connectivity on streets in the Junction, Englewood, and Uptown neighborhoods.  Supported by a $20 million RAISE grant from the US Department of Transportation, the city will make comprehensive upgrades to streets, sidewalks, bike lanes, and transit systems beginning in 2027.  This episode highlights the project history and invites residents to take part in a series of public input sessions beginning December 5, 2024, before the design phase begins.  Find the meeting schedule and more information about the project at toledo.oh.gov/RAISE.

Episode metadata supplied by the publisher feed · Published Dec 4, 2024

Embed this episode

Ready to play

Episode 55: Connecting Toledo Neighborhoods to Opportunity with the Dorr St. to Adams St. Project

0:00 11:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Wednesdays with Wade?

This episode is 11 minutes long.

When was this Wednesdays with Wade episode published?

This episode was published on December 4, 2024.

Can I download this Wednesdays with Wade episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!