Episode 55 - The half-life of nuclear data centers with Chris Lohse, Idaho National Laboratory episode artwork

EPISODE · May 16, 2024 · 44 MIN

Episode 55 - The half-life of nuclear data centers with Chris Lohse, Idaho National Laboratory

from DCD Zero Downtime: The Bi-Weekly Data Center Show · host DatacenterDynamics

Nuclear power may have its detractors, but amid a growing capacity crunch data center operators are becoming increasingly interested in whether atoms can provide the electrons needed to power tomorrow's high-density facilities. In this episode, Chris Lohse of the Idaho National Laboratory, talks about the recent innovations around nuclear power, the highs and lows of recent years, and what the future might hold for nuclear-powered data centers.

Episode metadata supplied by the publisher feed · Published May 16, 2024

Embed this episode

NOW PLAYING

Episode 55 - The half-life of nuclear data centers with Chris Lohse, Idaho National Laboratory

0:00 44:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of DCD Zero Downtime: The Bi-Weekly Data Center Show?

This episode is 44 minutes long.

When was this DCD Zero Downtime: The Bi-Weekly Data Center Show episode published?

This episode was published on May 16, 2024.

Can I download this DCD Zero Downtime: The Bi-Weekly Data Center Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!