Skip to content
Episode 69 episode artwork

Oct 28, 2024 18 min

Episode 69

from Asia Pacific Defence Reporter

In this episode we have some truly stunning – and worrying – information that the rate of US nuclear powered submarine construction is slowing down, not speeding up. The information is on the public record and comes from the CEO of Electric Boat, Phebe Novakovic in a briefing for shareholders. The problem is with the supply chain – companies manufacturing critical components cannot keep up with the required rate and as a consequence both the Columbia class SSBNs and Virginia SSNs will be delayed. This must be worrying news for the RAN – and it seems astounding that there has been no reporting of note in Australia about a development that could completely derail AUKUS Pillar One. The US also seems to be counting on Australia lifting Defence expenditure so that it can afford these submarines without cutting other capabilities – but that is exactly what has already started to happen. Finally, Defence officials have once again managed to get their way and have hounded German shipbuilding company Luerssen out of Australia.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Episode 69

0:00 18:29

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Asia Pacific Defence Reporter?

This episode is 18 minutes long.

When was this Asia Pacific Defence Reporter episode published?

This episode was published on October 28, 2024.

Can I download this Asia Pacific Defence Reporter episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.