Skip to content
EPISODE 7: Necessity episode artwork

Oct 19, 2017 27 min

EPISODE 7: Necessity

from End of the Line Hosted by pipelinepodcast.org

A week prior to the airing of this episode, FERC grants "Certificates of Public Convenience and Necessity" for both the Mountain Valley and Atlantic Coast Pipelines. What does this mean for pipeline fighters, and more importantly, are these pipeline projects really needed in order to meet energy demand for the Mid-Atlantic? In this episode, we get a lesson in the history of energy demand in the United States, plus a look at what is really driving energy holding companies to get into the pipeline building business. Original Air Date: 10/20/17

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

EPISODE 7: Necessity

0:00 27:31

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of End of the Line?

This episode is 27 minutes long.

When was this End of the Line episode published?

This episode was published on October 19, 2017.

Can I download this End of the Line episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.