Welcome to the Pipelineers podcast, episode 73, sponsored by Inter-SYS Corporation, providers of Poems, the Pipeline Operations Excellent Management System, compliance and operations software for the Pipeline Control Center. Find out more about Poems at intersyscorp.com. The Pipelineers podcast where professionals, bubba geeks and industry insiders share their knowledge and experience about technology, projects and pipeline operations. And now your host, Russell Tree.
Thanks for listening. I appreciate you taking the time and to show that appreciation, we are giving away a customized Yeti Tumblr to one listener each episode. This week, our winner is Bruce Flynn. Bruce, congratulations, your Yeti is on its way.
To learn how you can win this signature prize pack, stick around at the end of the episode. This week, the marathon trio returns, and we're going to talk about hydraulic design and working with the business development group. So I think you'll find this to be an engaging episode. So welcome back.
We've come up with a new nickname from the trio from Marathon Pipeline. They've named themselves Three-Face Flow and you missed it because you didn't hear our banter about the Miss Calibrated Compebulator before we got on the on the microphones here. So with that, welcome back. Kyle, Dan and Jason from Marathon Pipeline to talk about hydraulic designs.
Welcome back guys. We love it. Thanks. Thanks for having us, Russell.
So we were talking about this is before we got on the microphone and having a little fun at other people's expense because they weren't around to know about this idea of hydraulic engineers and the challenge sometimes we're faced with when the business development professionals are bringing their requests. So we put this episode together to and the title of it is hydraulic design for business development professionals. And I think the tagline is what every hydraulic engineer wishes that all business development professionals knew. So is that kind of sum it up guys?
I think that's pretty good. I guess I guess a good place to start is let's just talk a little bit of you know for some people that might not understand what hydraulic engineering is. What is hydraulic engineer? What are you guys doing?
What's your role and what is hydraulic design? So hydraulic design, there's a lot that goes into that. Mostly, it comes down to making sure that you get the capacity of the pipeline system that you want to will stay below your maximum operating pressure. And that involves where are your pumps going to discharge what kind of flow rate are you going to have?
What's your delivery pressure? How much pressure do you need to feed the system? And how is the system going to operate for the operation center or control center? Sounds easy if you say it fast.
So what information do you need to do all that? You need an elevation profile. You need to know what you're carrying in the pipe, butane, propane, cold light crude oil, West Texas, you know the strength of the pipe. So what your mop is and what your requirements for flow rate are on daily or hourly basis?
So how is that different when you're doing something that's Greenfield pipe versus something that is I'm adding to pipe that I already have? Right. So another way of maybe rephrasing what Jason led with, we like to say that we are the physics police of the company is everybody. Everybody wants to get more for less than the world of PSI barrels per hour drag reduction.
You're going to get what you get within the you know, the laws and the confines of the way nature works. So what we do is really try to understand all those relationships when we're starting from scratch, you know, a pipeline that doesn't exist. This guy is kind of the limit in terms of, Hey, you know, we can tell you different pipe sizes, what max operating pressures are going to need, how many pump stations you want, you might want how those are spaced apart on an existing system. Obviously, we're a lot less limited.
If it's old pipe, it's been cycled a bunch, it's low mop. That's really when we start off by looking at drag reduction, you know, maybe right off the bat, we're probably maxing it out mechanically. If we have certain number of stations, 40 miles apart is kind of our average spacing. If they're all hitting, they're maximum possible discharge, you've got to go drag reduction.
If we're building a new system from the start, we're going to try to get as much mechanical capacity as we can. And usually our main lines will build them to ASM e 600 class. And then we'll go from there in terms of that. Let's do a couple of definitions here.
So the first you're using the term drag reduction and certainly guys that are working in liquids are going to know what that is. But can you give us like just a quick explanation of what is drag reduction and how's it used? Right. So drag reduction agent is a magical unicorn snot.
We we're getting dragged into products. Oh wait, are we still still recording? Oh yeah. So I'm sorry, the technical term is also, let's write it when I'm Anglo.
Sorry, buddy. I'm just I'm tracking with you guys, but magical unicorn snot. Okay, snot. So it's really magical unicorn polymer chains that help to let's say, laminarize your flow and reduce your PSI drop per mile.
So obviously, without getting into vendors, we have several different cocktails that we use. And every different blend has an effectiveness that you can calculate. So we figure out what is the parts per million that we need to inject to reduce down to a certain PSI drop per mile. Let's start with that.
Yeah. So the way that I think about the the DRA agents is that basically they make the product slippery. You know, that they reduce the friction losses in the pipe. Yeah, absolutely.
And it's interesting too, because I'm sure we could do an episode just on that topic, because it sounds like you guys are doing some things and it might be part of the, you know, the secret sauce of how you operate in terms of exactly what agents you're using and how you're using them. Yeah, I think our business development people would get upset if we start talking about all the ways that we use DRA. Yeah, probably so, probably so. So, but I think I think it's helpful to kind of understand that that's, you know, that's part of this.
So there's the other thing I wanted to ask too, is, you know, obviously, there's a, you know, there's pressure and there's flow and there's pipe size. And what what you're trying to do is get to your optimal commercial operating state, given the combination of those three things, what do you find is easiest to address when you're doing one of these projects? Is it is it the pipe size? Is it the pumping?
Is it the MAOP? How do those relate? And so pumping is probably the easiest one to manipulate. We can we can add pipe stations or pump stations along the line or we can increase or decrease the size of pump station.
Replacing mainline segments or building new mainline segments can be rather expensive. And when you're talking about a new pipeline, you know, we want to try to keep that line as far as the cost of the pipe as low as we can. So we have to balance costs between additional pump stations with increased diameter, while at the same time looking at how fast the fluid is going to be moving through the pipe to make sure it's going to have enough velocity to scour water or anything else out of the pipe. You know, that puts a minimum on the velocity of a pipe.
But then we also have to keep it under certain velocities to reduce our risk for for surge pressures. Yeah, so one of the things that on a greenfield versus an upgrade of existing system that's different is the station spacing. And once you get your stations, in our experience, at least close to about 35 or 40 miles from each other, you run into operability issues where if you're trying to get the highest pressures you can in the highest flow rates, if you lose a downstream station, it'll send a transient back and knock off an upstream station. You can look at it from kind of the developments, perspective and second, let's just put a pump station every 10 miles on this pipeline and get as much out of as we can.
And yes, you could probably do that, but it's almost inoperable just because of the amount of transients and surges that are bouncing from station to station. So we always start with dancing, you look at the pipe diameter first, that's always the most important thing is your pipe diameter because that controls your friction drop per mile. And diameter has has an extremely large effect. So Jason mentioned brand new project, the first thing we're looking to do is size the pipe, maybe it's a situation where a 10 inch, you're going to be maybe 13 to 15 feet a second.
So we're under our our standards feed limit, you feel okay about your pipe erosion, but your friction loss is going to be very high, you're looking at more stations, maybe a 16 or 18 inch pipe, it's going to be drastically reduced, you know, by a factor of two, three, or four, you've reduced your friction drop, but you're paying a lot more for the steel. So we're trying to target a linear velocity in the pipe that kind of checks all the boxes. And for anybody out there who's a fluid student, you're starting out, we're talking about flow rate equals velocity times area. And then there's of course, there's a lot of different different friction drop equations, you can use from that, but there's only only so many ways you can go with it.
Right, right. And one area where business development can help us a lot in this area is that we need to understand if there's expected expansion of that system in the future, you know, if this is the first line into a new field or something like that, it's going to operate at maybe a little much lower rate in the beginning. And so you need to plan for that later expansion and to understand, you know, we want to make sure that we're not limited by pipe size, five years from now. So we got to make sure we understand that that potential.
Yeah, when you're when you're looking at that, particularly if you're, you know, you're kind of on the gathering end of a system where flows are more variable, at least in the short term, what kind of time frame are you looking at when you're looking at three years, you're looking at five, you're looking at 15, when you're evaluating these projects, what kind of time frames do you try to look at? Realistically, about five years, we won't be doing ourselves justice if we ever design a system so the minutes turned on, there's no further expansion opportunity on it. The bigger deal, for me personally, is to fully understand exactly what our friends and business and I want to transit through the pipeline. You know, if the requirement is we want to have 200,000 barrels a day.
Well, 200,000 barrels a day of gasoline is vastly different than 200,000 barrels a day of Canadian crude oil. And if we design for one thing and the fluid type is going to be switched, the pressure drop per mile changes and the effectiveness of the RA goes down. So on the outside of the project, it's a dance point you want to know, is this an intermediate step, which is there and what exactly are we going to be moving through this line during its lifetime? Yeah, you know, knowing a little bit about the business development side and the realities that those guys are up against, you know, they don't always know.
I mean, if you're if you're hooking up to a new field, you don't necessarily know exactly what that creates going to look like until you get some wells on one and then as you get more wells online, that may change. So I mean, obviously, there's a lot of potential unknowns here as you're working through this. So what's your process to kind of get some boundaries around a case? So to begin with, I think that we'll focus a lot on the worst case properties.
You know, Jason mentioned gasoline versus Canadian crude. Obviously, if we if we know off the bat, it's going to be a product system, even hearing that it's going to be all gasoline and then you add diesel later, that can be an issue. So diesel, you know, typically the heaviest product we move. So we're looking at highest specific gravity, highest viscosity, then we're looking at lowest gravity, lowest viscosity, and highest vapor pressure.
So those are the big five for us, highest and lowest gravity, highest and lowest viscosity, highest vapor pressure. So we'll put together even if we don't know for sure, we'll put together a slate of common products that we move, and we'll see how a system can handle those things from a pressure drop perspective, then you're getting into batch effects. And that's usually what we do if we don't know exactly what's going to happen. And honestly, you never know exactly what's going to happen.
Well, of course, the trials point, that's where there can be some disagreements between hydraulic to business development is we'll run through and we'll go to model the line and let's say we're in a product system, we're lading entire system down in gasoline, and it's going to achieve one flow rate. And we lay the entire system down into diesel fuel and it's going to achieve a different flow rate. So we would pose two numbers, we're going to have a max instantaneous flow rate, let's say 2,000 barrels an hour. But you're not always going to have gasoline in line, you're going to have diesel fuel sometimes and we get diesel fuel in line by around 1500.
So the capacity we'll deliver back is a mix of those two numbers somewhere in the middle. And that can be a sticking point is what you said here, you can go 2000 an hour, why are you only rating my system to 1800? Yeah, so when we talk about system capacity, we say, okay, what are ways you increase capacity? You know, maybe you probably on upsize the pipe, you could upsize the pipe, you could add more palms, you could add DRA, well, change in the slate might increase capacity, if it's possible.
Right, that's that's interesting to me because I would not have gotten there easily on my own, right? It's it that's not necessarily something you would think about I mean, obviously, as you kind of lay it out and explain it that makes sense. So I guess the process really is to try and create some boundary conditions around the fluid and the delivery requirements. Absolutely.
Yeah, that makes that makes that makes certain sense. You know, once you've kind of got those boundaries around, I'm a little hung up, I'm a little hung up, I'm going to play the business development guy. Why wouldn't you tell me? Well, your capacity is 1500 if it's diesel in 2000, if it's gasoline, why would you give me a a single number for capacity versus a product specific number for capacity?
Because when they go out with an open season, the business building side will go to an open season to the marketplace and say, I'm building a new pipeline, say I'm going to pipeline from Dallas to Houston, there's pipelines going to do 80,000 a day. They need to know that number. They can do it's going to be they need a basis for starting. Right.
That makes sense. And then as I guess, as they start to get as the business development starts to get commitments, that's starting to change the capacity or what are you doing? What are you doing? Because I'm again, I'm getting hung up because it's it's starting to get really complex in my head.
So I've said, okay, well, here is a system. And here are, here's your kind of baseline, what I think the capacity is, and then the commitment start coming in, you're going to rework all of your analysis and calculations based on those commitments, I would think is that that's one or up right? If if you have enough time to get ahead, and what we like to do is put together what we call capacity expansion analysis, and we'll start with your base case, your base case is going to be one pipeline, one origination station. And then step one is you got a need for more capacity, but a midpoint booster step two, you've gotten a little bit more, you start adding DRA step three, you add more conversations.
So when the final deliverable goes to business development, you outline a complete expansion study for this pipeline from inception to ultimate capacity of the system, and they can tie in what their nominations are matching up with on your expansion point. That makes sense. It's really a playbook so that they can make the decisions within the boundaries that we set. Well, that kind of tees up my my next question.
So what what are those boundaries look like? I mean, how do you communicate that to business development? Good documentation. So we'd write a lot of studies like word word documents between three to 20 pages depending on how sensitive and how complicated it is.
And we do this for every control valve, relief valve pump, you know, anything or if it's played that we spec out. And typically a capacity expansion analysis is the most complex thing you do, because there are so many options. Yeah, we'll come up with maybe a couple different pipe sizes if we're early enough for that different pump spacings. And then as the project process rolls along as your front end loading progresses through the project, that gives us opportunities to tighten our numbers.
So as the slate begins to take shape, as the project team says, Hey, now we've sized the pipe. Well, when they size the pipe, you know, we're in, we're in the March Madness season right now, the brackets getting smaller and smaller, you've got fewer and fewer choices. And now we're talking about number of stations, you know, spacing and things like that. So it all sort of follows the project process and we hand them a documented study to put it kind of in their hands.
But as far as constraints that we place on the system, we will specify the max viscosity of what the slate can be. We'll specify in some cases, if it's like a batch crew line will specify what percentage can be heavy or, or you know, we'll lay out the capacities based on percentage of heavy in the slate. We do put some limitations in there to try to narrow the field as much as we can. But we definitely want to leave it open as well so that we can maximize, you know, the business opportunities for that fight.
Right. Well, and I'm listening to this conversation, I'm kind of thinking about the process, the generally the long pole in the tent from a construction standpoint is getting the pipe roll. So it's also the, you know, it's also the biggest check you're going to write in the, you know, the constructions biggest line item in the construction projects going to be the pipe. So I would think that that's probably one of the first things you've got to try and nail down is what's my five size going to be.
Yeah, look at that. Make it stuff up and I'm right. Let's stop there. All right, it's been good once the answer.
Exactly. So so I think here's kind of the the $60,000 question. And that is, what is it that most time in your experience, what is it that most business development people either don't know or don't have the sensitivity for that you would like for them to know and have the sensitivity for in this process? What's the part that makes you crazy, I guess?
For me, it's the fact that this all builds on top of itself. We're doing an iterative project development cycle. And to go back to your point about the pipe diameter, once you pick a pipe diameter, everything is based on that pipe diameter. And if the nominations come in higher than expected, and they come back and, oh, well, I need to go from a 12 to a 16 inch.
Well, now all of your duty points on all of the pumps that you've started to specify needs to be changed. And all of the control valves that you were going to order all that needs changed, any different motor sizes, things that to them seem inconsequential, maybe inconsequential. But the fact that everything builds off of each other means that you have to basically start from scratch when small changes are made. Yeah.
And given the level of analysis and work you're doing to kind of build these operating envelopes out, that's a lot of work. Right. Yeah, it's not modifying pumps. It's throwing pumps out.
Yeah, you're starting over. I mean, you go from a 12 inch pipe to 16 inch pipe, you're starting over from scratch from from an engineering perspective. Right. The only thing about your hydraulic radiance that's the same now is the elevation profile, right?
Everything else is up the reps. And that goes even further upstream to the throughput number. So yeah, we told you 200, but now it's 280. That's possibly going to change the pipe and change everything else that we just mentioned.
Right. And from a, I would, you know, I'm trying to put my hat on from the other perspective and from a business development perspective. Hey, if I can get more commitments and justify a bigger by them, that's a good thing. Yeah, they're doing a great job.
Yeah. So is there anything else that you would want for the business development guys to kind of understand about what it is you guys do and such? I think slate sensitivity is a big deal. And understanding that that not all crude is the same, not all products are the same.
And that it can have a huge impact on what the capacity of that system is going to be even switching you know, from gas to diesel or from light crude heavy crude or even, you know, changing the percentage of those within a mix slate can can have a big impact on the capacity. And if it moves in enough, it can even change just by changing the slate, you can end up with having to redesign your pumps, because, you know, pumps have a minimum operating speed and a maximum operating flow and we got to stay within those bounds as well. So a small change, what seems like a small change on paper can be a big change, the our analysis. Yeah, the engineering work that's behind making that small changes big.
I think the other thing I would throw out there is a good hydraulic analysis on a business and other project makes up it can change the cap experts objects expenses. So you can you can do a real quick hydraulic analysis, use a rules of thumb, throw some equipment in the grounds and build it really quick and probably fairly cheap. But your pumps are going to be operating in suboptimal conditions and you're going to tear it up pumps, tear up motors, you're never going to realize the full capacity system. You do a good in depth hydraulic study, you're in with all the right size equipment, the systems are going to run much more steadier and more rateably.
Yeah, and I think that's a that's another really important, very important thing from a, you know, how do how to hydraulic engineers help their company achieve profitability? There's a there's a big difference in the way that you know, pipe liners look at CapEx versus OpEx. Right. It's and you know, once you're once your CapEx dollars are spent, you're kind of done and you get to operate the system you have within its constraints and limitations.
So to the extent you can get that right, CapEx you pay once, OpEx you just keep on paying it paying it paying it. Yeah. And what Jason said, I think it's it's very powerful and everybody in this in this industry should sit down and think about it. Project teams have their motivations, right?
They're looking at their cost index, their schedule index, they're going to get maybe benchmarked, you know, against other comparable projects in the industry. They want to keep that cost down. But if we took every single system we had in service right now and magically upsides them, you know, two inches, everything went up one nominal size, that would cut a lot of energy costs. So everything, everything's related.
And you need to think about how long you want an asset to be in service. If we want to run it for 50 or more years, like a lot of stuff that we still have, so a really good job on the front end and not just try to whip through it. Yeah, boy, you're saying a mouth mouthful there, absolutely saying a mouthful. I'm actually, I think actually, I want to make a request of you guys because I think this would actually be a topic that maybe we ought to do a series of episodes on hydraulic engineering or hydraulic design and kind of walk through the things we're talking about, but in a bit more detail.
That sounds like something you guys would be up for sure. Can we get our calculators out? Only if it's a good fabulator, those the only kind I use. Yeah, it's in the shop.
You put in a V8 in that, maybe all electric electric. That's great. Well, with that, I think we've come to the end of the episode. I think I want to do the three key takeaways here for this episode is because I think there's there's some value in that for a guy who's not a hydraulic engineer.
I think the I think the first thing is that a little bit of change means a lot of engineering work, because changing something as simple as a pipe size or a product type, I'm basically going back to scratch starting over with my engineering. I think that's that's the first key takeaway. I think the second key takeaway is that the product envelope, I guess what you call the slate, the products you're going to move and how you're going to move them is as big an issue, if not bigger issue, then how much you're actually going to move absolutely. And then lastly, if you can spend a little bit more money up front and have a little bit more time up front, then you can make more money in the long term.
So that's my three takeaways. How did I do? Good. No, excellent.
Well, gentlemen, if this is a pleasure as always, thank you very much. And we'll see you next time. Right. Thanks, Russell.
I hope you enjoyed this week's episode of the pipeline response podcast and our conversation with Dan, Kyle and Jason. Just a reminder before you go, you should register to win our customized pipelineers podcast Yeti Tumblr. Simply visit pipelineerspodcast.com slash when and yourself in the drawing. If you'd like to support this podcast, you can leave us a review on iTunes, Apple podcast, Google Play or whatever smart device app you happen to use, you can find instructions at pipelineerspodcast.com.
If you have ideas, questions or topics you'd be interested in, please let us know on the contact us page of pipelineers podcast.com or reach out to me directly on LinkedIn. Thanks for listening. I'll talk to you next week.