🎙️ Episode 8 Title: Gridlocked Growth: Powering AI, Data Centers & What Comes Next episode artwork

EPISODE · Apr 23, 2025 · 32 MIN

🎙️ Episode 8 Title: Gridlocked Growth: Powering AI, Data Centers & What Comes Next

from The Clean Energy Edge · host russbp

In Episode 8 of The Clean Energy Edge, host Russ Bates is joined by Peter Kelly, Managing Partner at Red Tree Engineering, to tackle the rapidly growing energy demands of AI and data centers—and what it means for the grid and generation mix. From transmission bottlenecks to interconnection delays, Peter shares real-world insight from the front lines of project development and design. They discuss: Why power-hungry data centers are reshaping infrastructure planning The reality of grid constraints and temporary energy workarounds What a future-ready generation mix really looks like—including gas, batteries, and SMRs How developers and utilities can prepare for what’s coming next If you're in energy, infrastructure, or site development—this one's for you. 🎧 Listen now on Apple Podcasts, Spotify, or your preferred platform. #CleanEnergy #DataCenters #GridConstraints #AI #EnergyTransition #SMRs #EnergyPolicy #TheCleanEnergyEdge

Episode metadata supplied by the publisher feed · Published Apr 23, 2025

Embed this episode

NOW PLAYING

🎙️ Episode 8 Title: Gridlocked Growth: Powering AI, Data Centers & What Comes Next

0:00 32:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Clean Energy Edge?

This episode is 32 minutes long.

When was this The Clean Energy Edge episode published?

This episode was published on April 23, 2025.

Can I download this The Clean Energy Edge episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!