Episode 83 - Blasting, consistent closure periods advance US 60 bridges project episode artwork

EPISODE · Jul 4, 2025 · 11 MIN

Episode 83 - Blasting, consistent closure periods advance US 60 bridges project

from On The Road With ADOT · host ADOT

ADOT 's Doug Nintzel sits down with Garin Groff to share updates on the highway 60 bridges near the Queen Creek tunnel.

Episode metadata supplied by the publisher feed · Published Jul 4, 2025

Embed this episode

NOW PLAYING

Episode 83 - Blasting, consistent closure periods advance US 60 bridges project

0:00 11:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Road With ADOT?

This episode is 11 minutes long.

When was this On The Road With ADOT episode published?

This episode was published on July 4, 2025.

Can I download this On The Road With ADOT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!