Episode S2/7: Saving Emery Grover
from Needham Say More Hosted by Aaron Pressman
Doug and Aaron discuss plans to renovate or replace the Emery Grover building in Needham center, which currently houses the Needham Public Schools administration. Some linesk related to this episode: Most recent 2020 Emery Grover feasibility study (starting on page 100 of this PDF) Report on the 2010 Emery Grover study
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Needham Say More?
This episode is 22 minutes long.
When was this Needham Say More episode published?
This episode was published on March 2, 2021.
Can I download this Needham Say More episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.