Eskom Solar Registration Deadline | Johannesburg News episode artwork

EPISODE · Sep 11, 2026 · 2 MIN

Eskom Solar Registration Deadline | Johannesburg News

from Johannesburg News Today | 2 Min News | The Daily News Now!

Don’t miss this solar registration deadline—Eskom’s fee waiver for grid-connected rooftop systems ends September 30, 2026. If your solar setup is under 50 kVA and tied to the grid, you’re required to register—even if you’re not exporting power. The waiver covers registration, connection, and metering fees, so act now to save money. You’ll need a Certificate of Compliance, inverter test cert, and installation report. Off-grid systems? No registration needed—but prove you’re fully disconnected. Safety first: all systems under 100 kVA must be registered with Eskom or your local municipality. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/5158fa947e13553a

Episode metadata supplied by the publisher feed · Published Sep 11, 2026

Embed this episode

Ready to play

Eskom Solar Registration Deadline | Johannesburg News

0:00 2:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Johannesburg News Today | 2 Min News | The Daily News Now!?

This episode is 2 minutes long.

When was this Johannesburg News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 11, 2026.

Can I download this Johannesburg News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!