Skip to content
ESSEGI improve their flagship tower on a smaller footprint episode artwork

May 17, 2024 6 min

ESSEGI improve their flagship tower on a smaller footprint

from Global SMT Podcast Hosted by Global SMT and Packaging

The latest version of the Essegi 3600 FA storage tower has been reconfigured to increase the automation for loading and unloading. The access door has been moved from the rear of the machine to the front side for easier access by AVGs.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

ESSEGI improve their flagship tower on a smaller footprint

0:00 6:01

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Global SMT Podcast?

This episode is 6 minutes long.

When was this Global SMT Podcast episode published?

This episode was published on May 17, 2024.

Can I download this Global SMT Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.