EPISODE · Jul 22, 2026 · 1 MIN
Euclid Ave Reconstruction Update | Pierre News
from Pierre News Today | 2 Min News | The Daily News Now!
Euclid Avenue in Pierre is getting a major upgrade—with inside lanes set to reopen Friday, July 24th, part of a $26.4 million SD DOT project. Traffic will flow from the Catholic church to Elizabeth Street by next week’s end, though outside lanes remain closed for safety while sidewalks are installed. The full stretch will eventually feature 3-5 lanes, including a turn lane and parking, all 11 feet wide—with sidewalk widths varying. A temporary four-way stop will appear at Euclid and Elizabeth once southern lanes open. Plus, a new overheight detection system near the train bridge warns trucks 12 feet tall or more—without damaging vehicles. Full completion targeted for November 20, 2026. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/22e880e85d286bd4
Embed this episode
NOW PLAYING
Euclid Ave Reconstruction Update | Pierre News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.