Exit Sandman: Army Corps Beach Nourishment Project in Montauk Ends episode artwork

EPISODE · Mar 7, 2024 · 57 MIN

Exit Sandman: Army Corps Beach Nourishment Project in Montauk Ends

from 27Speaks · host The Express News Group

The U.S. Army Corps of Engineers recently completed the bolstering of downtown Montauk’s oceanfront beaches with more than 500,000 tons of sand after just under three weeks of 24/7 work by crews aboard the giant hopper dredge Ellis Island and dozens of on-shore engineers. Reporter Michael Wright joins the editors to discuss the scope of the project and what to expect now that it's complete.

The U.S. Army Corps of Engineers recently completed the bolstering of downtown Montauk’s oceanfront beaches with more than 500,000 tons of sand after just under three weeks of 24/7 work by crews aboard the giant hopper dredge Ellis Island and dozens of on-shore engineers. Reporter Michael Wright joins the editors to discuss the scope of the project and what to expect now that it's complete.

NOW PLAYING

Exit Sandman: Army Corps Beach Nourishment Project in Montauk Ends

0:00 57:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 27Speaks?

This episode is 57 minutes long.

When was this 27Speaks episode published?

This episode was published on March 7, 2024.

What is this episode about?

The U.S. Army Corps of Engineers recently completed the bolstering of downtown Montauk’s oceanfront beaches with more than 500,000 tons of sand after just under three weeks of 24/7 work by crews aboard the giant hopper dredge Ellis Island and dozens...

Can I download this 27Speaks episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!