Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake episode artwork

EPISODE · May 11, 2026 · 23 MIN

Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake

from Mining Stock Daily · host Trevor Hall

Pirate Gold recently announced that drilling has expanded a large alteration system at its flagship Crippleback Lake project in Newfoundland. CEO Denis Laviolette spoke to Mining Stock Daily to discuss how these latest results confirm the presence of a robust hydrothermal system linked to the regionally significant Valentine Lake Fault Zone. Laviolette said there is widespread alteration, strong sulphide development, and a system that is just beginning to take shape.

Episode metadata supplied by the publisher feed · Published May 11, 2026

Embed this episode

NOW PLAYING

Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake

0:00 23:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mining Stock Daily?

This episode is 23 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on May 11, 2026.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!