EPISODE · May 11, 2026 · 23 MIN
Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake
from Mining Stock Daily · host Trevor Hall
Pirate Gold recently announced that drilling has expanded a large alteration system at its flagship Crippleback Lake project in Newfoundland. CEO Denis Laviolette spoke to Mining Stock Daily to discuss how these latest results confirm the presence of a robust hydrothermal system linked to the regionally significant Valentine Lake Fault Zone. Laviolette said there is widespread alteration, strong sulphide development, and a system that is just beginning to take shape.
What this episode covers
Pirate Gold recently announced that drilling has expanded a large alteration system at its flagship Crippleback Lake project in Newfoundland. CEO Denis Laviolette spoke to Mining Stock Daily to discuss how these latest results confirm the presence of a robust hydrothermal system linked to the regionally significant Valentine Lake Fault Zone. Laviolette said there is widespread alteration, strong sulphide development, and a system that is just beginning to take shape.
NOW PLAYING
Expanding the Footprint: Pirate Gold’s Large-Scale Alteration System at Crippleback Lake
No transcript for this episode yet
Similar Episodes
No similar episodes found.