EPISODE · Jun 1, 2026 · 24 MIN
Expertas analizan el proyecto de planta de biometano previsto en Llíria
from Valencia
Entrevista a Raquel Martínez Barranca, gerente de Sostenibilidad y HSE en Enagás Renovable, y a Sara Gargallo Bellés, Business Project Manager de Biometano en Genia Bioenergy
Embed this episode
NOW PLAYING
Expertas analizan el proyecto de planta de biometano previsto en Llíria
0:00
24:23
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Valencia?
This episode is 24 minutes long.
When was this Valencia episode published?
This episode was published on June 1, 2026.
Can I download this Valencia episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!