[EXPRESS] 'Change Orders' episode artwork

EPISODE · Sep 28, 2021 · 24 MIN

[EXPRESS] 'Change Orders'

from Spaces Podcast

Project changes deep into design or construction can be costly for everyone involved. Jason and Dimitrius discuss what a change order is, some ways it impacts the project team, ways to mitigate the impact, and larger concerns with the way project phasing typically works. Thank you to our sponsors!TwinmotionTwinmotion is a real-time rendering solution used by architecture, engineering, and construction professionals to create high-quality imagery, client presentations, and interactive experiences that help communicate your BIM data and design ideas, fast. Visit twinmotion.link/spaces and try Twinmotion for free.Show Music:Intro - "Keep Calm and Chill" by SoundrollOutro - "What' by Aldous YoungIf you enjoy our content, you can check out similar content from our fellow creators at Gābl Media. Mentioned in this episode:DATM

Episode metadata supplied by the publisher feed · Published Sep 28, 2021

Embed this episode

Ready to play

[EXPRESS] 'Change Orders'

0:00 24:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Spaces Podcast?

This episode is 24 minutes long.

When was this Spaces Podcast episode published?

This episode was published on September 28, 2021.

Can I download this Spaces Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!