Extreme Makeover Transforming West Jordan High School
from Jordan Supercast
They are building for the future at West Jordan High School in more ways than one as extensive renovations begin inside the 45-year-old building. On this episode of the Supercast, we take you inside West Jordan High where an extreme makeover will transform many parts of the school, bringing it up-to-date, and into more modern times. It’s a makeover that is expected to save District taxpayers more than $100 million compared to the cost of a full rebuild. Let’s check it out.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Jordan Supercast?
This episode is 19 minutes long.
When was this Jordan Supercast episode published?
This episode was published on July 30, 2026.
Can I download this Jordan Supercast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.