“Extremely Complex  Build” Is A Wrap In Melbourne CBD episode artwork

EPISODE · Jul 24, 2020 · 5 MIN

“Extremely Complex Build” Is A Wrap In Melbourne CBD

from Elevator World · host Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com “EXTREMELY COMPLEX BUILD” IS A WRAP IN MELBOURNE CBD A project comprising a 38-story, 43,000-m2 office tower and a 255-room hotel that contractor Multiplex described as "an extremely complex build" is complete in the Melbourne, Australia, CBD, The Urban Developer reports. Boasting a Schindler vertical-transportation system, 80 Collins Street is owned by Australian property giant Dexus and was designed by Woods Bagot and UN Studio. Graham Cottam of Multiplex observed the job involved 7,000 mT of structural steel and 30,000 m3 of concrete, and called for the office tower to cantilever over existing buildings. This, he said, was "the first time this engineering feat has been achieved on such a scale." Image credit: courtesy of Woods Bagot To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode metadata supplied by the publisher feed · Published Jul 24, 2020

Embed this episode

NOW PLAYING

“Extremely Complex Build” Is A Wrap In Melbourne CBD

0:00 5:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevator World?

This episode is 5 minutes long.

When was this Elevator World episode published?

This episode was published on July 24, 2020.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!