Face CT 3/21/21
from WTIC Public Affairs
Eversource VP Mike Ausere discusses the Revolution Wind project to be based out of the State Pier in New London.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of WTIC Public Affairs?
This episode is 23 minutes long.
When was this WTIC Public Affairs episode published?
This episode was published on March 21, 2021.
Can I download this WTIC Public Affairs episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.