EPISODE · Jul 26, 2026 · 5 MIN
FERC Puts PJM on Notice as AI Load Hits Water and Chip Supply — July 26, 2026
from The Data Center Daily · host The Data Center Daily — Lantern Podcasts
FERC is warning PJM to adopt grid reforms by September or face federal action, while Virginia weighs tighter data-center water rules and Wistron starts U.S. assembly of NVIDIA GB300 systems in Fort Worth. In this episode: Top stories: 1. FERC will impose reforms if PJM fails to adopt changes by September, chairman warns | Utility Dive — Utility Dive https://www.utilitydive.com/news/ferc-pjm-governance-reforms-data-centers-capacity-market/826140/ 2. Virginia study on groundwater, data centers calls for tighter water regulations — WSLS https://www.wsls.com/business/2026/07/24/virginia-study-on-groundwater-data-centers-calls-for-tighter-water-regulations/ 3. Fort Worth Factory Becomes First US Site to Build NVIDIA GB300 Superchips — TechTimes https://www.techtimes.com/articles/321457/20260724/fort-worth-factory-becomes-first-us-site-build-nvidia-gb300-superchips.htm Follow and rate The Data Center Daily on Apple Podcasts or Spotify. Feedback? Email [email protected]
Embed this episode
Ready to play
FERC Puts PJM on Notice as AI Load Hits Water and Chip Supply — July 26, 2026
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.