Feste Brücke 69 – taktischer Einbau
from Info Schweizer Armee Hosted by Digitale Medien der Armee DMA
Brückensystem aus einer Leichtmetall-Konstruktion. Überwindet Hindernisse bis zu 40m.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Info Schweizer Armee?
This episode is 3 minutes long.
When was this Info Schweizer Armee episode published?
This episode was published on November 21, 2012.
Can I download this Info Schweizer Armee episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.