EPISODE · Sep 14, 2026 · 0 MIN
Finalizan las obras del nuevo Centro de Salud de Corbera
from Alzira
La Conselleria sigue con la ampliación del CSI en Sueca, con el nuevo Consultorio de Massalavés y entra en la última fase administrativa previa a la ejecución de la ampliación del Centro de Salud de Algemesí
Embed this episode
Ready to play
Finalizan las obras del nuevo Centro de Salud de Corbera
0:00
0:45
1×
No transcript for this episode yet
Similar Episodes
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Alzira?
This episode is 0 minutes long.
When was this Alzira episode published?
This episode was published on September 14, 2026.
Can I download this Alzira episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!