EPISODE · Apr 27, 2026 · 1H 8M
Finding the critical path in your farm shop. 908-652-0154
from Idle Chatter: Hot Rod Farmer
Originally published 7/7/2021. The direct route takes planning and looks as if nothing is happening.
Embed this episode
NOW PLAYING
Finding the critical path in your farm shop. 908-652-0154
0:00
1:08:54
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Idle Chatter: Hot Rod Farmer?
This episode is 1 hour and 8 minutes long.
When was this Idle Chatter: Hot Rod Farmer episode published?
This episode was published on April 27, 2026.
Can I download this Idle Chatter: Hot Rod Farmer episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!