Fire Outbreak at Akosombo Substation Disrupts Power Supply – GRIDCo episode artwork

EPISODE · Apr 24, 2026 · 17 MIN

Fire Outbreak at Akosombo Substation Disrupts Power Supply – GRIDCo

from Adom Kasiebo

Ghana Grid Company Limited has announced that a fire outbreak at the Akosombo Substation has disrupted operations and affected electricity supply in parts of the country

NOW PLAYING

Fire Outbreak at Akosombo Substation Disrupts Power Supply – GRIDCo

0:00 17:50

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Adom Kasiebo?

This episode is 17 minutes long.

When was this Adom Kasiebo episode published?

This episode was published on April 24, 2026.

What is this episode about?

Ghana Grid Company Limited has announced that a fire outbreak at the Akosombo Substation has disrupted operations and affected electricity supply in parts of the country

Can I download this Adom Kasiebo episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!