EPISODE · Sep 4, 2026 · 1 MIN
First Niger Bridge Shutdown for Major Repairs | Nigeria News
from Nigeria News Today | 2 Min News | The Daily News Now!
First Niger Bridge in Onitsha is shutting down for two weeks starting Monday, September 7, 2026, not for routine maintenance but because of severe vandalism—bolts and iron rods stolen, leaving the structure dangerously compromised. The Ministry of Works is launching emergency repairs: milling old asphalt, laying new surfacing, installing solar-powered lights and CCTV cameras to boost security. Traffic will be rerouted to the Second Niger Bridge with clear signage and diversions. Work is underway around the clock to restore safety and functionality, despite the short-term inconvenience. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/047b1c0e05906c25
Embed this episode
NOW PLAYING
First Niger Bridge Shutdown for Major Repairs | Nigeria News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.