EPISODE · Apr 29, 2025 · 5 MIN
First-Time CEO, Big-Time Impact: Kelly Brewer on Her First 90 Days
from Take 5 With Cleanfax – an ISSA Podcast · host ISSA
Listen to Kelly Brewer, the new CEO of Insurcomm, describe her journey and the future of the company.
Embed this episode
Ready to play
First-Time CEO, Big-Time Impact: Kelly Brewer on Her First 90 Days
0:00
5:36
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Take 5 With Cleanfax – an ISSA Podcast?
This episode is 5 minutes long.
When was this Take 5 With Cleanfax – an ISSA Podcast episode published?
This episode was published on April 29, 2025.
Can I download this Take 5 With Cleanfax – an ISSA Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!