Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England episode artwork

EPISODE · Nov 12, 2025 · 3 MIN

Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England

from The ATMOsphere Podcast Network · host ATMOsphere

A leisure center in northern England has replaced its gas boilers and combined heat and power (CHP) plant with five CO2 (R744) heat pumps supplied by U.K. HVAC&R manufacturer Clade Engineering.The installation at the Orford Jubilee Neighbourhood Hub in Warrington comprises five Maple SN/300 heat pumps, providing a total heating output of 1.5MW (426.5TR).Read the full story on NaturalRefrigerants.com.

Episode metadata supplied by the publisher feed · Published Nov 12, 2025

Embed this episode

NOW PLAYING

Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England

0:00 3:20

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The ATMOsphere Podcast Network?

This episode is 3 minutes long.

When was this The ATMOsphere Podcast Network episode published?

This episode was published on November 12, 2025.

Can I download this The ATMOsphere Podcast Network episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!