EPISODE · Jul 8, 2026 · 1 MIN
Fix 50 Nearly Done, Night Work Continues | Sacramento News
from Sacramento News Today | 2 Min News | The Daily News Now!
Sacramento drivers, the long wait on Highway 50 is almost over! The Fix 50 project is in its final stretch, with most major work already complete. Crews are now focused on nighttime finishing touches — lane striping, traffic lights, guardrails, drainage, public art, and overhead sign wiring. The main stretch stays fully open during the day. Full completion expected by summer’s end, though some ramps are still being worked on. Stay updated via the Caltrans QuickMap app for real-time lane and ramp info. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c771af6dd720d8e5
Embed this episode
NOW PLAYING
Fix 50 Nearly Done, Night Work Continues | Sacramento News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.