PodParley PodParley

Fixing interconnection

ERCOT is connecting power generators faster than any other electricity market in the country. Could we fix the U.S. interconnection bottleneck, Texas-style?

An episode of the Catalyst with Shayle Kann podcast, hosted by Latitude Media, titled "Fixing interconnection" was published on September 21, 2023 and runs 42 minutes.

September 21, 2023 ·42m · Catalyst with Shayle Kann

0:00 / 0:00

Everything's bigger in Texas—the hats, the boots, the convenience stores. But its interconnection times? They’re surprisingly short. In the U.S. it takes power generators four years on average to get approval to connect to the grid, and in some places, it takes far longer. In the Texas electricity market, it takes only about 1.5 years between interconnection request and agreement. And it costs way less to interconnect, too.  The results are telling. The Texas grid, operated by the Electricity Reliability Council of Texas, or ERCOT, has installed more wind power than any other state—40+ gigawatts worth. It’s also installed 19 gigawatts of solar power, second only to California. ERCOT has interconnected two times more generation than PJM, an electricity market in the Mid-Atlantic, even though PJM is two times larger than ERCOT in terms of peak load.  So what does Texas know about interconnection that the rest of the U.S. doesn’t? And how could other states learn from Texas?  In this episode, Shayle talks to Tyler Norris, PhD student at Duke University’s Nicholas School of the Environment and former vice president of development at Cypress Creek Renewables. Tyler recently published a policy brief on how the U.S. could reform its interconnection process, applying lessons from ERCOT. They cover topics like: Why FERC’s system impact studies lead to long delays and high costs ERCOT’s shorter and lower-cost process, called “connect-and-manage” Recommended Resources: Duke Nicholas Institute: Beyond FERC Order 2023: Considerations on Deep Interconnection Reform Catalyst: Understanding the transmission bottleneck FERC: E-1: Commissioner Clements Concurrence on Order No. 2023: Improvements to Generator Interconnection Procedures and Agreements Brattle Group: Generation Interconnection and Transmission Planning Sign up for Latitude Media’s Frontier Forum on January 29, featuring Crux CEO Alfred Johnson, who will break down the budding market for clean energy tax credits. We’ll dissect current transactions and pricing, compare buyer and seller expectations, and look at where the market is headed in 2024.

Everything's bigger in Texas—the hats, the boots, the convenience stores. But its interconnection times? They’re surprisingly short. In the U.S. it takes power generators four years on average to get approval to connect to the grid, and in some places, it takes far longer. In the Texas electricity market, it takes only about 1.5 years between interconnection request and agreement. And it costs way less to interconnect, too.  The results are telling. The Texas grid, operated by the Electricity Reliability Council of Texas, or ERCOT, has installed more wind power than any other state—40+ gigawatts worth. It’s also installed 19 gigawatts of solar power, second only to California. ERCOT has interconnected two times more generation than PJM, an electricity market in the Mid-Atlantic, even though PJM is two times larger than ERCOT in terms of peak load.  So what does Texas know about interconnection that the rest of the U.S. doesn’t? And how could other states learn from Texas?  In this episode, Shayle talks to Tyler Norris, PhD student at Duke University’s Nicholas School of the Environment and former vice president of development at Cypress Creek Renewables. Tyler recently published a policy brief on how the U.S. could reform its interconnection process, applying lessons from ERCOT. They cover topics like: Why FERC’s system impact studies lead to long delays and high costs ERCOT’s shorter and lower-cost process, called “connect-and-manage” Recommended Resources: Duke Nicholas Institute: Beyond FERC Order 2023: Considerations on Deep Interconnection Reform Catalyst: Understanding the transmission bottleneck FERC: E-1: Commissioner Clements Concurrence on Order No. 2023: Improvements to Generator Interconnection Procedures and Agreements Brattle Group: Generation Interconnection and Transmission Planning Sign up for Latitude Media’s Frontier Forum on January 29, featuring Crux CEO Alfred Johnson, who will break down the budding market for clean energy tax credits. We’ll dissect current transactions and pricing, compare buyer and seller expectations, and look at where the market is headed in 2024.
Catalyst - Capacity Building for Careers in the Social Sector Sauraveswar Sen Catalyst was established in 2011 in Kolkata, India with an aim to create prospective human service professionals who will enable people to overcome poverty, deprivation and unemployment. Today, the institute keeps the vision alive through extensive online teaching, research, policy support and field action programs. Every year by enabling students all across India to successfully qualify the Bachelors, Masters, MPhil-PhD Fellowship Entrance Tests, Interviews of globally recognised social science institutions, Catalyst continues to produce committed high quality prospective professionals in a range of social and human development sectors; health, mental health, social epidemiology, clinical psychology, education and vocational skill development, human resource management, media and cultural studies, rural and urban development, livelihoods and social entrepreneurship, climate change, disaster management, regulatory governance, focused work on women, children, adolescents, youth, aged, d The Catalyst Social Hour Steve Glynn A monthly podcast bringing people and ideas together. Each month we invite entrepreneurs, artists, innovators, and makers to share their stories with us live at Transfer Pizzeria Cafe in Milwaukee. GBOCT X-Treme Faith Ministries with Bishop Kevin Lydell Smith Bishop Kevin Lydell Smith In an age of increasing violence, and in a world that no longer reflects God’s power, there stands a man that is poised to be a catalyst of positive change on God’s behalf. Bishop Kevin Lydell Smith, Senior Pastor of The Greater Body of Christ Temple / XTreme Faith Ministries, is that man; and he being formally introduced to the world as a spokesman for God. The Feminine Epicurean with Shan Sally shan sally Soften into joy for epic health and wellness. The feminine epicurean path allows desire and pleasure to be the guiding force and the magic of joy as the catalyst for a radiant lifestyle. Support this podcast: https://anchor.fm/shan-sally/support
URL copied to clipboard!