Flood Recovery Boost for Vermont episode artwork

EPISODE · Jun 12, 2026 · 1 MIN

Flood Recovery Boost for Vermont

from Burlington News Today | 2 Min News | The Daily News Now!

Vermont’s getting a major federal lifeline—over $4 million to rebuild after back-to-back devastating floods. Senator Peter Welch confirmed FEMA’s big push, with $1.8 million going directly to the Vermont Studio Center in Johnson, which lost its iconic Wolf Kahn barn and spent three years fighting for this recovery funding. The rest supports the Vermont Agency of Transportation and Washington Electric Co-op, critical for restoring infrastructure hit hard by the deluges. It’s a powerful reminder: when local leaders advocate, federal aid can—and does—reach the communities that need it most. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/2bdf57261cc03dfd

Episode metadata supplied by the publisher feed · Published Jun 12, 2026

Embed this episode

NOW PLAYING

Flood Recovery Boost for Vermont

0:00 1:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Burlington News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Burlington News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 12, 2026.

Can I download this Burlington News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!