From Churchill Falls to Muskrat Falls: An Interview with the President and CEO of Newfoundland and Labrador Hydro episode artwork

EPISODE · Jun 4, 2024 · 43 MIN

From Churchill Falls to Muskrat Falls: An Interview with the President and CEO of Newfoundland and Labrador Hydro

from ARC ENERGY IDEAS · host ARC ENERGY RESEARCH INSTITUTE

This week, our guest is Jennifer Williams, President and CEO of Newfoundland and Labrador Hydro. Hydro manages Newfoundland and Labrador’s electricity system, generating and transmitting most of the province's electricity, and exporting electricity to other parts of Canada and the United States. Newfoundland and Labrador Hydro operates several hydroelectric plants, including the Churchill Falls Generation Station in Labrador, which has a capacity of nearly 5,500 MW and is among the top ten hydro dams in the world outside of China. The utility has also recently commissioned Muskrat Falls, with a capacity of 824 MW. Here are some of the questions Peter and Jackie ask Jennifer: What percentage of the electricity generated in the province is exported? Is Muskrat Falls operating at full capacity now, including the undersea transmission lines? What were some of the reasons for the high cost of Muskrat Falls?  Can you discuss Churchill Falls, the technical achievement of building the project, and the contract that set a low power price for 70 years? How much potential is there to develop additional generation in the province?  Do you anticipate green hydrogen projects operating in the region? From your perspective, why was the Atlantic Loop transmission project scaled back? Are you concerned about the draft Clean Electricity Regulations legislation, which proposes net- zero electricity by 2035?  Content referenced in this podcast:  The Canadian Association of Petroleum Producers (CAPP) commissioned a report on the economic impact of the federal government’s proposed oil gas emissions cap on the conventional oil and gas industry  Muskrat Falls Inquiry Website Supreme Court of Canada Judgment:  Churchill Falls (Labrador) Corp. v. Hydro‑Québec  Please review our disclaimer at: https://www.arcenergyinstitute.com/disclaimer/  Check us out on social media:  X (Twitter): @arcenergyinst LinkedIn: @ARC Energy Research Institute Subscribe to ARC Energy Ideas Podcast Apple Podcasts  Amazon Music Spotify  

Episode metadata supplied by the publisher feed · Published Jun 4, 2024

Embed this episode

This week, our guest is Jennifer Williams, President and CEO of Newfoundland and Labrador Hydro. Hydro manages Newfoundland and Labrador’s electricity system, generating and transmitting most of the province's electricity, and exporting electricity to other parts of Canada and the United States. Newfoundland and Labrador Hydro operates several hydroelectric plants, including the Churchill Falls Generation Station in Labrador, which has a capacity of nearly 5,500 MW and is among the top...

Distinct summary based on available episode metadata or transcript content.

Ready to play

From Churchill Falls to Muskrat Falls: An Interview with the President and CEO of Newfoundland and Labrador Hydro

0:00 43:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of ARC ENERGY IDEAS?

This episode is 43 minutes long.

When was this ARC ENERGY IDEAS episode published?

This episode was published on June 4, 2024.

Can I download this ARC ENERGY IDEAS episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!