From the editor: How will Columbus' $2 billion airport upgrade change local air travel episode artwork

EPISODE · Oct 27, 2024 · 12 MIN

From the editor: How will Columbus' $2 billion airport upgrade change local air travel

from From the Newsroom: The Columbus Dispatch · host Gannett

Columbus Dispatch executive editor Michael Shearer speaks with business reporter Mark Williams to discuss how the airport authority is set to begin construction on a new $2 billion terminal early in 2025.

Episode metadata supplied by the publisher feed · Published Oct 27, 2024

Embed this episode

From the editor: How will Columbus' $2 billion airport upgrade change local air travel

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

From the editor: How will Columbus' $2 billion airport upgrade change local air travel

0:00 12:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of From the Newsroom: The Columbus Dispatch?

This episode is 12 minutes long.

When was this From the Newsroom: The Columbus Dispatch episode published?

This episode was published on October 27, 2024.

Can I download this From the Newsroom: The Columbus Dispatch episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!