From the Ground Up Ep. 369: Cenovus Energy’s Rush Lake Facility Gas Leak | 2025.08.13 episode artwork

EPISODE · Aug 14, 2025 · 28 MIN

From the Ground Up Ep. 369: Cenovus Energy’s Rush Lake Facility Gas Leak | 2025.08.13

from From the Ground Up

Mylan Tootoosis discusses the nearly three-month-long Cenovus Rush Lake 2 Facility gas leak that occurred in Saskatchewan and shares the impact it has had on his community.Mylan Tootoosis originates from Poundmaker Cree Nation within Treaty Six Territory and proudly identifies as Nêhiyawpwat (Plains Cree-Nakota). He holds a Master of Arts in Indigenous Governance from the University of Victoria (2013) and a Bachelor of Arts in Indigenous Liberal Studies from the Institute of American Indian Arts in Santa Fe, New Mexico.To learn more about Mylan, please check out:https://www.mylanmurdo.com/ Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Aug 14, 2025

Embed this episode

NOW PLAYING

From the Ground Up Ep. 369: Cenovus Energy’s Rush Lake Facility Gas Leak | 2025.08.13

0:00 28:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of From the Ground Up?

This episode is 28 minutes long.

When was this From the Ground Up episode published?

This episode was published on August 14, 2025.

Can I download this From the Ground Up episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!