EPISODE · Jun 11, 2026 · 1 MIN
Frontage Road Resurfacing in Bozeman
from Bozeman News Today | 2 Min News | The Daily News Now!
Montana DOT is resurfacing Frontage Road in Bozeman starting June 15th, from east of Springhill Road to the Cherry River Fishing Access overpass — expect single-lane delays during daylight hours. The full resurfacing project, including milling, new pavement, and chip sealing, aims to extend the road’s life and prevent costly repairs later. Work should wrap up by June 25th, weather permitting. Drivers: plan ahead, avoid the route if possible, and check MDT 511 or call 406-556-4700 for updates. A little hassle now for a smoother ride down the road. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/6e1e0d17e89ea12d
NOW PLAYING
Frontage Road Resurfacing in Bozeman
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.