Frustrated south coast Wellington residents face long wait episode artwork

EPISODE · May 20, 2026 · 4 MIN

Frustrated south coast Wellington residents face long wait

from Checkpoint

Too little, too late. That's the view of some frustrated Wellington residents on the city's south coast, who are facing a long wait for the failing Moa Point wastewater treatment plant to be completely fixed.

Episode metadata supplied by the publisher feed · Published May 20, 2026

Embed this episode

NOW PLAYING

Frustrated south coast Wellington residents face long wait

0:00 4:11

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Checkpoint?

This episode is 4 minutes long.

When was this Checkpoint episode published?

This episode was published on May 20, 2026.

Can I download this Checkpoint episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!