Furnace Commissioning w/ MeasureQuick 2.0 episode artwork

EPISODE · Oct 27, 2022 · 1H 24M

Furnace Commissioning w/ MeasureQuick 2.0

from HVAC School - For Techs, By Techs

Jim Bergmann returns to the podcast to talk about furnace commissioning procedures and the development of measureQuick 2.0. MeasureQuick 2.0 has been a collaborative effort between Jim Bergmann and Joe Medosch, and it comes with an upgraded user interface that allows for faster operation and easier system data access and storage, and it works with more tool manufacturers' tools. Gas furnaces need to be commissioned to reach their maximum potential (and lifespan). MeasureQuick 2.0 provides commissioning instructions and recommends starting with a visual inspection, including the flame rectification system (rod, circuit board, and grounding). Electricity is conducted during the flame rectification process—only in the microamp scale—so a dedicated circuit is crucial to keep it working as it should. When commissioning a high-efficiency furnace, we should make sure the condensate drain cannot become clogged. The filter should block the airstream completely and not allow for any bypass, which could make the secondary heat exchanger, condensate drain, or circuit board dirty. The combustion air zone (CAZ) is also important; we don't want contaminants in there, as those could create acids that rot out your furnace components. Jim has also recently worked with the folks at TEC to make MeasureQuick 2.0 compatible with the TrueFlow grid and DG8. This integration allows you to identify airflow issues much more quickly and easily than before. MeasureQuick 2.0 also stores a lot more historical data, especially as it relates to the built-in visual inspection checklist. Jim and Bryan also discuss: The history and methodology of measureQuick 2.0 What technicians tend to miss the most Furnace circuit boards Electrical signals and flame rectification Filtration best practices IAQ accessories and pressure drop Combustion air zone (CAZ) Evolution of airflow measurement with measureQuick Venting termination considerations Clocking the meter and setting the fuel pressure CO and CO air-free PPM Low-level CO protection Checking manifold and inlet pressure Is the industry ready for universal heat pumps?   If you have an iPhone, subscribe to the podcast HERE, and if you have an Android phone, subscribe HERE. Check out our handy calculators HERE.

Episode metadata supplied by the publisher feed · Published Oct 27, 2022

Embed this episode

NOW PLAYING

Furnace Commissioning w/ MeasureQuick 2.0

0:00 1:24:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HVAC School - For Techs, By Techs?

This episode is 1 hour and 24 minutes long.

When was this HVAC School - For Techs, By Techs episode published?

This episode was published on October 27, 2022.

Can I download this HVAC School - For Techs, By Techs episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!