Future proofing of Bonmahon's wastewater treatment plant urgent episode artwork

EPISODE · Jul 10, 2025 · 5 MIN

Future proofing of Bonmahon's wastewater treatment plant urgent

from The Big Breakfast Blaa

The future development of Bonmahon is fully dependent on upgrades to its waterwater treatment plant.Currently, according to a local principal, development is hampered in the area.Planning permission cannot be granted for new homes until such time as the treatment plant can withstand additional pressures.Bernadette Murphy is the principal of Knockmahon National School in Bonmahon.Her concerns, she says are urgent, around the future-proofing of school enrolment numbers.Additionally, she says the significant efforts of locals to make the most of the region are being undermined by the failures of Uisce Eireann.She spoke with Dymphna as part of this week's Tour de Blaa in Bonmahon.Click on the image to listen back in full.

Episode metadata supplied by the publisher feed · Published Jul 10, 2025

Embed this episode

NOW PLAYING

Future proofing of Bonmahon's wastewater treatment plant urgent

0:00 5:35

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Big Breakfast Blaa?

This episode is 5 minutes long.

When was this The Big Breakfast Blaa episode published?

This episode was published on July 10, 2025.

Can I download this The Big Breakfast Blaa episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!