EPISODE · Aug 11, 2026 · 1 MIN
Gas Line Strikes Halt Miles Road Project | Cleveland News
from Cleveland News Today | 2 Min News | The Daily News Now!
Three gas line strikes in 15 days forced a halt to the Miles Road waterline project in Orange Village, triggering road closures and shelter-in-place alerts. Enbridge Gas has now completed re-mapping all gas lines east of Brainard Road, and officials from both Orange Village and Solon are coordinating to prevent future disruptions. With safety as top priority, Enbridge is deploying an onsite response team to work alongside Terrace Construction, which will restart work this Thursday using hand digging and extra verification steps to ensure zero surprises under the ground. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/fe5b576ef9b10bcf
Embed this episode
NOW PLAYING
Gas Line Strikes Halt Miles Road Project | Cleveland News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.