EPISODE · Aug 17, 2026 · 2 MIN
Glassford Hill Road Widening Project Update | August 17th - 21st, 2026
from SignalsAZ.com - Arizona News Podcast
Send us a text and chime in!Please note that in the event of inclement weather, the work schedule may be altered without notice. Roadway Construction Ongoing in Second Phase Roadway excavation, subgrade preparation and the installation of curb, gutter and sidewalk will continue within the second phase of work along Glassford Hill Road, from Spouse Drive to the southern intersection of Granville Parkway. Please be aware of the following impacts: Monday, August 17 through Friday, August 21, 7 a.m. – 7 p.m. Please note that traffic patterns will be shifting throughout the week, and road users are advised to be alert, use caution and follow the... For the written story, read here >> https://www.signalsaz.com/articles/glassford-hill-road-widening-project-update-august-17th-21st-2026/ Check out the CAST11.com Website at: https://CAST11.com Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZFollow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network
Embed this episode
What this episode covers
Send us a text and chime in! Please note that in the event of inclement weather, the work schedule may be altered without notice. Roadway Construction Ongoing in Second Phase Roadway excavation, subgrade preparation and the installation of curb, gutter and sidewalk will continue within the second phase of work along Glassford Hill Road, from Spouse Drive to the southern intersection of Granville Parkway. Please be aware of the following impacts: Monday, August 17 through Friday, August 21, 7 ...
NOW PLAYING
Glassford Hill Road Widening Project Update | August 17th - 21st, 2026
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.