GPC Infrastructure's Gauri Potdar: Addressing Power Constraints in the Data Center Industry episode artwork

EPISODE · Jun 13, 2025 · 7 MIN

GPC Infrastructure's Gauri Potdar: Addressing Power Constraints in the Data Center Industry

from JSA Podcasts | Telecom, Digital Infrastructure and Data Center News, Insights + More · host Jaymie Scotto & Associates

Gauri Potdar, Chief Commercial Officer at GPC Infrastructure, joined us on JSA TV live from Metro Connect USA to discuss how GPC is addressing power constraints in the data center industry. From innovative solutions in energy to enhancing efficiency with waste heat, Gauri shared insights on how GPC is transforming the power landscape. 🔋

Episode metadata supplied by the publisher feed · Published Jun 13, 2025

Embed this episode

NOW PLAYING

GPC Infrastructure's Gauri Potdar: Addressing Power Constraints in the Data Center Industry

0:00 7:38

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of JSA Podcasts | Telecom, Digital Infrastructure and Data Center News, Insights + More?

This episode is 7 minutes long.

When was this JSA Podcasts | Telecom, Digital Infrastructure and Data Center News, Insights + More episode published?

This episode was published on June 13, 2025.

Can I download this JSA Podcasts | Telecom, Digital Infrastructure and Data Center News, Insights + More episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!