EPISODE · Aug 26, 2026 · 1 MIN
Green Line Stations Ready for Construction | Calgary News
from Calgary News Today | 2 Min News | The Daily News Now!
Six Green Line stations are officially ready for construction, marking a major milestone in the $6.5 billion southeast transit project—shovels hit the ground next spring. Shepard, Douglas Glen, Quarry Park, South Hill, Ogden, and Lynnwood Millican lead the first wave of completed designs, while elevated stations at Highfield, 26th Ave SE, and Ramsay/Inglewood await finalization. Grand Central’s downtown connection remains in flux, with a key report due September 8. Community input shaped every station to feel native to its neighborhood, prioritizing safety through open sightlines, glass walls, and lighting. Plazas and gathering spaces turn stations into vibrant community hubs. With designs locked in, civil construction kicks off next year, paving the way for trackwork and systems—groundwork like the maintenance facility and steel orders sets the stage for a massive 2027–2028 buildout. Listen in comfort: Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN: [email protected] This is an automated, high-level news summary based on public reporting. Report issues to [email protected]. View sources & latest updates: https://sources.thednn.ai/54ce5bd6ec4a02b3
Embed this episode
Ready to play
Green Line Stations Ready for Construction | Calgary News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.