Green New Deal for Oshawa w Russ Christianson episode artwork

EPISODE · Dec 31, 2019 · 53 MIN

Green New Deal for Oshawa w Russ Christianson

from Planet Haliburton · host Terry Moore

<p>On Friday December 20, 2019 the last vehicle rolled off the assembly line at the GM Oshawa Plant throwing 5,000 direct employees out of work as well as eliminating an additional 10,000 indirect supplier jobs across Ontario.</p><p><br></p><p>On September 13, 2019, in the middle of the federal election campaign, Green Jobs Oshawa and the Canadian Worker Co-op Federation released a feasibility study supporting the conversion of GM Oshawa into a publicly-owned centre for green vehicle production.</p><p>On the next episode of Planet Haliburton we interview the principal author of that study, Russ Christianson, about what the proposal contains, how it’s been received and its future prospects.</p><p><br></p><p>Show Notes: https://canoefm.com/wp-content/uploads/2019/12/Background-Resources-for-Planet-Haliburton-December-30-2019.pdf</p>

Episode metadata supplied by the publisher feed · Published Dec 31, 2019

Embed this episode

NOW PLAYING

Green New Deal for Oshawa w Russ Christianson

0:00 53:49

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Planet Haliburton?

This episode is 53 minutes long.

When was this Planet Haliburton episode published?

This episode was published on December 31, 2019.

Can I download this Planet Haliburton episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!