Greg Deese-Gateway Expressway episode artwork

EPISODE · Apr 24, 2024 · 8 MIN

Greg Deese-Gateway Expressway

from Beyond the News WFLA Interviews

Newsradio WFLA's Read Shepherd talks to Greg Deese, F-DOT Regional Engineer, about the impending opening of the Gateway Expressway, which will connect I-275, US 19, and the approach to the Bayside Bridge.  The toll road is set to open to drivers on Friday, April 26.See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Apr 24, 2024

Newsradio WFLA's Read Shepherd talks to Greg Deese, F-DOT Regional Engineer, about the impending opening of the Gateway Expressway, which will connect I-275, US 19, and the approach to the Bayside Bridge.  The toll road is set to open to drivers on...

PodParley-generated summary based on available episode metadata and transcript content.

NOW PLAYING

Greg Deese-Gateway Expressway

0:00 8:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Beyond the News WFLA Interviews?

This episode is 8 minutes long.

When was this Beyond the News WFLA Interviews episode published?

This episode was published on April 24, 2024.

What is this episode about?

Newsradio WFLA's Read Shepherd talks to Greg Deese, F-DOT Regional Engineer, about the impending opening of the Gateway Expressway, which will connect I-275, US 19, and the approach to the Bayside Bridge.  The toll road is set to open to drivers on...

Can I download this Beyond the News WFLA Interviews episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!