EPISODE · Jun 19, 2026 · 19 MIN
Guest: Eric Fullerton of project44 on plastic shortages due to oil restrictions; The logistics behind the World Cup; Getting the most from robots and their humans
from Logistics Matters with DC VELOCITY · host AGiLE Business Media
Our guest on this week's episode is Eric Fullerton, Vice President of Data Insights and Product Marketing at project44. There is now an agreement in place to end the fighting between the United States and Iran – and we hope it will be a lasting peace. But it will be a while before the world gets back to normal and we can recover from the blockage of the Strait of Hormuz. And that includes not just the flow of oil, but also products made from petroleum, such as plastics. We may find some products delayed or scarce due to waiting on plastic parts. Our guest joins DC Velocity’s Senior News Editor Ben Ames to explain the situation and to predict how long it will be before these supply chains normalize.For the next month or so the entire world is focusing on North America and the biggest sporting event on the globe – soccer’s World Cup. Putting on such a huge event takes a lot of planning – and lots and lots of logistics support. Senior Editor Victoria Kickham reports on the people who do the logistics work to make sure that the World Cup comes off without a hitch.We’ve seen a huge explosion of new robotics tools in our supply chain facilities, whether we’re talking about handheld and wearable computers or material handling automation or mobile robots. This week Ben Ames shares a report he saw on how workers can get the most out of those new tools. This was a study from researchers at Erasmus University in Rotterdam, the Netherlands. And they found that the best way to combine humans and robots for ideal results in warehouse work is for employees to circulate between working with various co-bot partners, not with a single dedicated robot.Articles and resources mentioned in this episode:project44Logistics workers score big in World Cup prepResearch shows that warehouse workers do best when they switch between co-botsVisit DC VelocityVisit Supply Chain XchangeSend feedback about this podcast to [email protected] podcast episode is sponsored by: ID Label
Embed this episode
What this episode covers
Our guest on this week's episode is Eric Fullerton, Vice President of Data Insights and Product Marketing at project44. There is now an agreement in place to end the fighting between the United States and Iran – and we hope it will be a lasting peace. But it will be a while before the world gets back to normal and we can recover from the blockage of the Strait of Hormuz. And that includes not just the flow of oil, but also products made from petroleum, such as plastics. We may find some produ...
Ready to play
Guest: Eric Fullerton of project44 on plastic shortages due to oil restrictions; The logistics behind the World Cup; Getting the most from robots and their humans
No transcript for this episode yet
Similar Episodes
No similar episodes found.