Gunsight Bridge Replacement Slated for September episode artwork

EPISODE · Apr 26, 2018 · 1 MIN

Gunsight Bridge Replacement Slated for September

from KBUT · host KBUT

The bridge that connects the Slate River Road to Gunsight Road and the Lower Loop will be replaced this September. The Crested Butte Land Trust will perform restoration work to reduce some of the backwater habitat that has been caused by the placement of trusses in the river. The bridge will be a full-span bridge. The total project cost is an estimated $400,000.

Episode metadata supplied by the publisher feed · Published Apr 26, 2018

Embed this episode

NOW PLAYING

Gunsight Bridge Replacement Slated for September

0:00 1:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of KBUT?

This episode is 1 minute long.

When was this KBUT episode published?

This episode was published on April 26, 2018.

Can I download this KBUT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!