Skip to content
HCMC needs additional VND30 trillion to complete Beltway 2 episode artwork

Sep 16, 2023 4 min

HCMC needs additional VND30 trillion to complete Beltway 2

from Saigon Times Podcasts Hosted by The Saigon Times

The HCMC Department of Transport has said that over VND30 trillion is needed for an 11.3-kilometer section of Beltway No. 2 that has not yet been built.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

HCMC needs additional VND30 trillion to complete Beltway 2

0:00 4:59

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Saigon Times Podcasts?

This episode is 4 minutes long.

When was this Saigon Times Podcasts episode published?

This episode was published on September 16, 2023.

Can I download this Saigon Times Podcasts episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.