Head of I-5 bridge replacement project says it‘s time to get it done, but critics remain episode artwork

EPISODE · Sep 15, 2021 · 24 MIN

Head of I-5 bridge replacement project says it‘s time to get it done, but critics remain

from KGW’s Straight Talk · host Laural Porter/KGW

Greg Johnson, the leader of the Interstate Bridge Replacement project, and Joe Cortright, a Portland economist opposed to replacing the bridge, discuss the latest bridge project and concerns about the cost, tolling and congestion. 

Episode metadata supplied by the publisher feed · Published Sep 15, 2021

Embed this episode

NOW PLAYING

Head of I-5 bridge replacement project says it‘s time to get it done, but critics remain

0:00 24:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of KGW’s Straight Talk?

This episode is 24 minutes long.

When was this KGW’s Straight Talk episode published?

This episode was published on September 15, 2021.

Can I download this KGW’s Straight Talk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!