Skip to content
Heavy Up? episode artwork

EPISODE · Sep 6, 2024 · 23 MIN

Heavy Up?

from Nat King Code · host Nat King Code

In this week's episode, King James Stallcup and I tackle the myth that all 3-wire 240-volt circuits must be replaced during a 'heavy up' electrical service upgrade. We break down the facts and explain why there's no NEC reference that mandates this, busting yet another common electrical misconception.

Episode metadata supplied by the publisher feed · Published Sep 6, 2024

Embed this episode

Ready to play

Heavy Up?

0:00 23:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Nat King Code?

This episode is 23 minutes long.

When was this Nat King Code episode published?

This episode was published on September 6, 2024.

Can I download this Nat King Code episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!