High Line Maintenance and Operations Facilities Center episode artwork

EPISODE · Jan 9, 2026 · 2 MIN

High Line Maintenance and Operations Facilities Center

from cultureNOW Museum Without Walls · host culturenoworg

Elizabeth Leber, Partner at Beyer Blinder Belle speaks on the design features of the High Line Maintenance and Operations Facilities Center, which seamlessly integrate the new building with the existing High Line.

Episode metadata supplied by the publisher feed · Published Jan 9, 2026

Embed this episode

NOW PLAYING

High Line Maintenance and Operations Facilities Center

0:00 2:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of cultureNOW Museum Without Walls?

This episode is 2 minutes long.

When was this cultureNOW Museum Without Walls episode published?

This episode was published on January 9, 2026.

Can I download this cultureNOW Museum Without Walls episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!