EPISODE · Jan 9, 2026 · 2 MIN
High Line Maintenance and Operations Facilities Center
from cultureNOW Museum Without Walls · host culturenoworg
Elizabeth Leber, Partner at Beyer Blinder Belle speaks on the design features of the High Line Maintenance and Operations Facilities Center, which seamlessly integrate the new building with the existing High Line.
Embed this episode
NOW PLAYING
High Line Maintenance and Operations Facilities Center
0:00
2:01
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of cultureNOW Museum Without Walls?
This episode is 2 minutes long.
When was this cultureNOW Museum Without Walls episode published?
This episode was published on January 9, 2026.
Can I download this cultureNOW Museum Without Walls episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!