EPISODE · Feb 3, 2017 · 1 MIN
High resolution structural inspection of flooded tunnel
from Case stories · host The Teledyne Marine Channel
High resolution structural inspection of flooded tunnel using BlueView T2250 360° Multibeam Profiling Sonar and Teledyne PDS.
Embed this episode
NOW PLAYING
High resolution structural inspection of flooded tunnel
0:00
1:09
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Case stories?
This episode is 1 minute long.
When was this Case stories episode published?
This episode was published on February 3, 2017.
Can I download this Case stories episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!